The MOD identified a need for lightweight shelter that would be able to be erected in a short time providing battlefield logistics support. In partnership with a design and build company Custom Covers developed a structure to meet this requirement and were awarded the contract.
To fabricate a fabric roof to cover a Scottish quarry. The quarry was to provide Europe's largest enclosed climbing facility and the Architects were looking for a design solution that allowed the maximum amount of natural day light to penetrate.
To produce an eye-catching booth to promote a popular and soft drink.
To provide a shaded area adjacent to his swimming pool. The cover needed to survive UK summer weather on an exposed site.
Pages: | << | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 |