3 Metre
|
6 Metre
|
6 Metre
|
9 Metre
|
12 Metre
|
|
Eave Height |
2.3m |
2m |
2.3m |
2.3m |
2.3m |
Ridge Height |
2.85m |
3.100m |
3.392m |
3.938m |
4.484m |
Bay Length |
3m |
2m |
3m |
3m |
3.03m |
Roof Pitch |
20º |
20º |
20º |
20º |
20º |
Longest Component |
3m |
3.200m |
3.392m |
4.789m |
6.385m |
Bracing (Roof) |
N/A |
Plastic Coated |
Plastic Coated |
Plastic Coated |
Plastic Coated |
Bracing (Walls) |
Aluminium Cross |
Aluminium Cross |
Aluminium Cross |
Aluminium Cross |
Aluminium Cross |
Max Suspended |
100kg |
100kg |
100kg |
100kg |
100kg |
Design Snow Load using Snow Ties |
100kg/M2 |
100kg/M2 |
100kg/M2 |
- |
- |
Wind Loading to BS EN 13782 (2005) |
28m/s |
28m/s |
28m/s |
36m/s |
28m/s |
PVC |
Flame retardant |
Flame retardant |
Flame retardant |
Flame retardant |
Flame retardant |
People to Pitch |
2 |
2 |
2 |
2 |
4 |
Time Required to |
1.5hrs |
2hrs |
2.5hrs |
3hrs |
4.5hrs |
1st Bay Weight (KG) |
180 |
200 |
270 |
370 |
670 |
Extension Bay |
90 |
100 |
110 |
140 |
240 |
Profile |
94 x 48 |
94 x 48 |
94 x 48 |
94 x 48 |
114 x 80 |