Home » Marketplace » Accessories » Accessories » Tubular Rivet 12mm [Pack of 1000]

Go Back

Tubular Rivet 12mm [Pack of 1000]

14-RID-T12 Rivet Double Tubular 12mm (800x536)

A pack of 1000 Double Tubular Rivets, used for repair of PVC covers.
 

 
Order before 12:00 (noon) for same-day dispatch
Price: £340.00 (Ex VAT) Pack of 1000
Quantity:

Product Details

Product Specifications

Description Double Tubular Rivet [2 Part]
Compatibility Used on PVC Windows
Used on PVC Walls
Used on PVC Roofs
Used on PVC Gables

Gallery

Rivets of Max Clear Rivets of Roof Rivets on Gable

Rivet Locations on Standard Custom Covers PVC

Related Products

Help

How to Install Keder Balls (Using Rivets)

Keder balls assemble 1
(From L-R: Double Tubular Rivets, 8mm Keder Ball, Backing Plate)
 

1.Cut holes in fabric & Assemble both sides of fitting.
Keder balls assemble 2
2. Place rivets in 12mm ball fitting through fabric.
Keder balls assemble 3

3. Place back plate over rivets.

Keder balls assemble 4

4. Close rivets with sharp strike using a steel hammer.
Keder balls assemble 5

5. Rivets should deform into each other to make a secure fixing.
 Keder balls assemble 6

 

Delivery

Orders processed through our online shop can be collected from our Winchester Depot or shipped to UK Mainland. We can process other non-UK Mainland orders via our sales team, so please call them on 02380 335 744 or email sales@customcovers.co.uk. All online orders are sent via TNT, as our default courier. We use their express service, which is next day delivery across mainland UK (excluding Highlands, Islands and parts of Wales and Cornwall. Please see map below for more information).


Please see our delivery rates below:

Weight Rate
1-20kg £20.00
21-50kg £29.00
51-100kg £57.00
101-150kg £86.00
151kg+ £86.00 + 60p Per kg

These rates applies to deliveries to the UK mainland only (excluding Highlands, Islands and Cornwall). 


We despatch via courier each working day (Monday - Friday), excluding Bank Holidays and the Christmas break. Due to current high demand of stock items, we aim to despatch your order 7 days from point of payment.
On items that require manufacturing and testing, please do allow extra time as your order will need to be scheduled into production. During our busiest periods (April - July), please allow a few days for delivery and do advise us of any critical delivery deadlines.

For more details on delivery and returns click here